•    +41 43 243 51 51
  •    This email address is being protected from spambots. You need JavaScript enabled to view it.
  •    

Manufacturing of tubes for a new chemical plant, successful start-up beginning of 2020

22.04.2020

King has welded stainless steel tubes of diverse diameters (among them double jacket tubes) and together with the numerous machines / apparatus, installed and connected to an existing production plant.

Project size: 1'600 meters of tubes, duration 5 months, approximately 15'000 man hours.